Process · For Nigerian Brands

How to Order Knitwear from Turkey to Nigeria: A 5-Step Process

From initial brief to goods at your Lagos warehouse. Here's exactly how the process works, what we need from you at each stage, and what to expect on timeline, documentation and cost.

Ordering knitwear from a Turkish manufacturer for the first time is a different process than buying finished stock from a trader in Lagos or importing pre-made goods from China. The process has more steps, a longer timeline, and requires more upfront communication — but it produces a genuinely custom garment built to your label and spec. One thing that makes Turkey easier than most Asian sources for a Nigerian brand: we run the entire process in English, so your tech pack, comments and approvals are understood exactly as written, with no translation gap. Here's how it works with us, step by step.

The 5-Step Process

1

Send Your Brief

Share whatever you have: a tech pack, a reference image, a sketch, or a description of what you want to make. The more specific you can be on stitch structure, gauge, yarn type, colours, size range, and target quantity, the faster we can give you useful numbers. We don't require a finished tech pack to start — we can help develop the construction spec from a reference. Because we work in English, you can write your brief exactly as you'd brief a designer at home and we'll read it the same way.

What we need at minimum: style category (pullover, cardigan, vest, etc.), target gauge range, yarn type (merino, cotton, mohair, cashmere blend, etc.), colourway count, size range, and approximate order quantity. Our minimum order is 250 pieces per colour, per size. Send to info@kiwigiyim.com or via WhatsApp at info@kiwigiyim.com.

Response time: 1 business day with a preliminary CMT range or follow-up questions. New to the factory? Start on our OEM knitwear manufacturer page to see what we make.

2

Proto Sample (10–14 Days)

We produce a proto sample at $80–180 including courier shipping to Lagos. The sample is produced in the specified stitch structure and gauge, in your closest available yarn if the exact spec yarn isn't in stock. We ship via DHL or FedEx express to your address in Nigeria.

Sample review: evaluate fit, construction quality, stitch definition, and hand feel. If revisions are needed, we produce a revised sample at a reduced fee or incorporate changes into bulk if the revisions are minor. Most programmes need one proto and one revision sample before bulk. This is also the stage to compare what in-house flat-knit can do — see our merino cardigan and mohair cardigan programmes.

Payment: sample fee paid in full before production (T/T bank transfer or card via invoice link), quoted in USD.

3

Order Confirmation & 30% Deposit

Once the sample is approved, we issue a formal purchase order confirmation with: style details, yarn spec, colourways, quantities per size, unit CMT price, total amount, and the production and delivery timeline. You confirm and pay a 30% deposit.

At this stage we also: confirm yarn availability and source your specified fibre if not already in stock; schedule a production slot (typically 2–4 weeks from deposit to production start); and confirm the export documents you'll need for clearance. Because the Naira can move sharply, we quote and settle in USD and can work against a letter of credit — this protects both sides and matches how most Nigerian importers already pay. Open your supplier file early: a quick call with us before you raise your Form M keeps the paperwork aligned.

4

Bulk Production (45–60 Days)

Most programmes run 45–60 days from production start to goods-ready. Complex constructions (intarsia, multi-stitch jacquard, WHOLEGARMENT) or larger quantities may add 1–2 weeks. We send a production update at the midpoint and a pre-shipment QC report when production is complete. All knitting is done in-house on our own machines — 15 Shima Seiki WHOLEGARMENT units and 7 Stoll flat-knit machines — so quality and timing stay under one roof.

Pre-production sample: one unit produced at the start of the bulk run for final construction confirmation. If you want this shipped to you for review before we run the full order, we can arrange that — it adds 7–10 days. Most clients with an approved proto skip this for faster delivery. Browse style options like our cotton sweater and turtleneck programmes while production runs.

5

Balance Payment & Shipment

When production is complete, we send the final QC report with measurements and photo documentation. You pay the 70% balance, and we ship. Standard shipment is ocean LCL (less than container load) from Mersin port; transit to Lagos — Apapa, Tin Can Island or the Lekki Deep Sea Port — is typically 10–14 days.

Documentation included: commercial invoice, packing list, bill of lading, and certificate of origin. We provide the documents your licensed clearing agent needs to process your Form M and obtain the PAAR (Pre-Arrival Assessment Report) through the NICIS II platform, plus a SONCAP certificate where the product category requires SON conformity. Care labels and fibre-content labels are produced to your spec and to NIS labelling expectations.

Incoterms: we typically quote FOB Mersin or CIF Lagos. CIF lands the goods at your port of entry, after which your clearing agent handles duty and clearance; we'll recommend the structure that fits your setup.

Full Timeline Summary

Stage Duration Your action
Brief → Proto start3–5 daysSend brief, confirm sample spec, pay sample fee
Proto production10–14 daysWait
Proto review & revision5–14 daysReview, request revisions, approve
Order confirmation → production start14–28 daysConfirm PO, pay 30% deposit, open Form M
Bulk production45–60 daysReview midpoint update, approve QC report
Balance payment → shipment3–5 daysPay 70% balance
Ocean transit to Lagos10–14 daysBrief clearing agent, secure PAAR & clearance
Total (first order)~13–17 weeksPlan your collection calendar accordingly

Common Questions

Is Turkish knitwear cheaper than Chinese once duty is added?

Be honest with yourself on this: Turkey gives you no customs advantage over China into Nigeria. There is no Turkey–Nigeria free trade agreement, so Turkish goods clear under the ECOWAS Common External Tariff like anyone else's — roughly 20% on apparel, plus VAT and levies, and as high as 35% on some textile categories. China has no FTA either, so both origins pay the same duty. Choose Turkey for quality, full in-house flat-knit and WHOLEGARMENT capability, English-language communication, China+1 supply security, and genuine private-label control — not for a cheaper landed price.

How long does shipping to Lagos actually take?

Ocean freight from Mersin to Lagos is typically 10–14 days in transit to Apapa, Tin Can Island or the Lekki Deep Sea Port. Add your own clearance time on top — that depends on your Form M, PAAR and clearing agent, not on us. We ship samples by DHL/FedEx express, which arrive much faster.

What import documents will I need, and do you provide them?

For commercial clearance into Nigeria you'll work through a valid Form M, get a PAAR via the NICIS II platform, and — for regulated product categories — a SONCAP certificate under SON's conformity scheme. We provide the export-side documents your clearing agent needs: commercial invoice, packing list, bill of lading, certificate of origin, and fibre-content and care labelling to NIS expectations. Your licensed agent files the Nigerian-side paperwork.

Can you help with yarn sourcing?

Yes. We work with established yarn suppliers across Italy (Zegna Baruffa, Tollegno), Turkey, and China for commodity yarns. We can source merino, cashmere, alpaca, mohair, cotton, TENCEL, and recycled fibre to your spec. Specify the fibre, count, and any certification requirements (OEKO-TEX, GRS, BCI) in your brief. Turkish knitwear is a premium complement to Nigeria's own textile base around Kaduna — different positioning, not a price-down on local cotton basics.

How do I pay when the Naira is moving?

We quote and settle in USD, and we're comfortable working against a letter of credit. That's how most Nigerian importers already structure overseas purchases, and it removes exchange-rate guesswork from both sides: you lock the USD figure at order confirmation, pay 30% deposit and 70% balance against documents, and your bank handles the Form M and FX side.

Ready to Start?

Send your brief or tech pack. We'll reply within 1 business day with a preliminary CMT range and any questions about your construction — in clear English, with no commitment required at this stage.

Order Process Guides

Step 1

How to Choose a Knitwear OEM for a Nigerian Brand

What to check before you brief a factory — capability, MOQ, samples and red flags.

Read guide →

Step 2

Turkish Knitwear Lead Times for Nigeria

Sampling to shipment to Lagos: a realistic week-by-week timeline you can plan against.

Read guide →

Step 3

Import Duty on Turkish Knitwear into Nigeria

ECOWAS CET, VAT and levies — and why there's no tariff edge over China.

Read guide →

Step 4

SONCAP & Quality Standards from a Turkey Factory

SON conformity, labelling and the QC checks to confirm before a shipment leaves.

Read guide →

Planning

Lagos Port Import Logistics

Apapa, Tin Can and Lekki: Form M, PAAR and clearing your knitwear smoothly.

Read guide →
Email Us